Disturbance Voltage/Current/Power Testing
Date:
2019-01-02
View:
6
![传导电压/电流/功率骚扰 传导电压/电流/功率骚扰]()
More facilities
2019
-
01
-
02
eCHG: EV REESS devices and HV components EMC testing LabStandard 3 meter method anechoic chamber 3.2m turntable, 4m antenna tower At the same time in line with automotive electronics / military standards 2-way water-cooled pipelineMeets the EMC test requirements for the following equipment: EV Cord set ...
2019
-
01
-
02
eMOT: New energy Vehcile electric-Motor loading EMC testing Lab Chamber size: 9.7x7.9x4.8m Shielded double door, 2.4x2.4 meters Meets CISPR 25:2016 Level 5 3-way water-cooled pipeline Fresh air system Water cooled (silent) dynamometer ...
2019
-
01
-
02
eDRV: EV e-Drive Assembly System and in-wheel motor loading EMC testing Chamber dimensions: 7.0 x 6.7 x 4.5m Dual dynamometers The specs of each individual dyno: Power 100kW, torque 955Nm, speed 2500rpm Battery Simulator: 250kW (1000V/±1200A) 3-way water-cooled pipeline
2019
-
01
-
02
Chamber size: 7.2x6.2x4m Test table 4.5x1.2 meters Circulating water pipe DN25 Gas waveguide Power filter: high voltage 32A, DC 100A, three phase 32A, single phase 32A Radiation disturbance measurement (RE, 10Hz-7GHz) CISPR 25 (automotive electronics...