E1 Immunity Development System
Date:
2019-08-05
View:
16
More facilities
2019
-
01
-
02
10m Method Whole Vehicle EMC Testing LaboratoryThe 10m method whole vehicle EMC testing laboratory was put into use by the end of 2020. The laboratory meets the EMC testing requirements of various passenger cars such as small and medium-sized commercial vehicles, along with various special vehicles, including new-energy and networked intelligent vehicles. The laboratory meets international standar...
2019
-
01
-
02
eCHG: EV REESS devices and HV components EMC testing LabStandard 3 meter method anechoic chamber 3.2m turntable, 4m antenna tower At the same time in line with automotive electronics / military standards 2-way water-cooled pipelineMeets the EMC test requirements for the following equipment: EV Cord set ...
2019
-
01
-
02
eMOT: New energy Vehcile electric-Motor loading EMC testing Lab Chamber size: 9.7x7.9x4.8m Shielded double door, 2.4x2.4 meters Meets CISPR 25:2016 Level 5 3-way water-cooled pipeline Fresh air system Water cooled (silent) dynamometer ...
2019
-
01
-
02
eDRV: EV e-Drive Assembly System and in-wheel motor loading EMC testing Chamber dimensions: 7.0 x 6.7 x 4.5m Dual dynamometers The specs of each individual dyno: Power 100kW, torque 955Nm, speed 2500rpm Battery Simulator: 250kW (1000V/±1200A) 3-way water-cooled pipeline