2019
-
01
-
02
eCHG: EV REESS devices and HV components EMC testing LabStandard 3 meter method anechoic chamber3.2m turntable, 4m antenna towerAt the same time in line with automotive electronics / military standards2-way water-cooled pipelineMeets the EMC test requirements for the following equipment:EV Cord setEV OBC, up to 250kWHigh power DC/DC up to 120kWAutomotive ESAs, DUT maximum size 4.0x1.2 metersVariou...