服务热线: 025-58075428
关注我们随时掌控教育资讯
我们一直在您身边
Facilities Equipment

for Electric-motor loading

Date: 2019-01-02
View: 47
source:

eMOT: New energy Vehcile electric-Motor loading EMC testing Lab 

新能源汽车电机加载试验室

    Chamber size: 9.7x7.9x4.8m 

    Shielded double door, 2.4x2.4 meters 

    Meets CISPR 25:2016 Level 5 

    3-way water-cooled pipeline 

    Fresh air system 

Water cooled (silent) dynamometer 

    Power: 283kW 

    Torque: 600Nm 

    Maximum speed: 12,000 rpm 

Battery Simulator: 

    Voltage: 1000V 

    Current: ±500A 

    Power 160kW


新能源汽车电机加载试验室


Dynamometer insulation spindle 

Shielded long axis 

    The shaft of the long shaft and the shield are connected by a brush to become a complete ground. 

Allows full shielding of the motor under test 

Spindle voltage measurement 

Spindle current measurement 

Energy feedback, extremely small total power consumption, safe and reliable


EMC Lab for Electric-motor loading

More facilities
2019 - 01 - 02
10m Method Whole Vehicle EMC Testing LaboratoryThe 10m method whole vehicle EMC testing laboratory was put into use by the end of 2020. The laboratory meets the EMC testing requirements of various passenger cars such as small and medium-sized commercial vehicles, along with various special vehicles, including new-energy and networked intelligent vehicles. The laboratory meets international standar...
2019 - 01 - 02
eCHG: EV REESS devices and HV components EMC testing LabStandard 3 meter method anechoic chamber    3.2m turntable, 4m antenna tower    At the same time in line with automotive electronics / military standards    2-way water-cooled pipelineMeets the EMC test requirements for the following equipment:    EV Cord set ...
2019 - 01 - 02
eMOT: New energy Vehcile electric-Motor loading EMC testing Lab     Chamber size: 9.7x7.9x4.8m     Shielded double door, 2.4x2.4 meters     Meets CISPR 25:2016 Level 5     3-way water-cooled pipeline     Fresh air system Water cooled (silent) dynamometer  ...
2019 - 01 - 02
eDRV: EV e-Drive Assembly System and in-wheel motor loading EMC testing Chamber dimensions: 7.0 x 6.7 x 4.5m Dual dynamometers The specs of each individual dyno:     Power 100kW, torque 955Nm, speed 2500rpm Battery Simulator: 250kW (1000V/±1200A) 3-way water-cooled pipeline
Navigation
Message
Contact us
Follow us
  • Name:
  • *
  • 公司名称:
  • *
  • 地址:
  • *
  • Phone :
  • *
  • 传真:
  • *
  • E-mail:
  • *
  • 邮政编码:
  • *
  • 留言主题:
  • *
  • Content:
  • *
     
Nanjing Rongce Testing Technology Ltd
Address:No.2108 Chengxin Avenue, Jiangning
Phone:025-58075428
Website:www.emcdir.cn
This week's top searches:
Sharing site
Copyright ©2018 - 2021 Nanjing Rongce Testing Technology Ltd
XINIU  Site map
犀牛云提供云计算服务
X
3

SKYPE 设置

4

阿里旺旺设置

等待加载动态数据...

等待加载动态数据...

5

电话号码管理

  • 025-58075428
6

二维码管理

等待加载动态数据...

等待加载动态数据...

展开